Sailing Umaβίντεο

We're Cutting Off our Keel (Part 1 of 4) | Step 448

13 Ιουλίου 2025 · 37 λεπτά · 143K προβολές

Τι καλύπτει αυτό το βίντεο

The owners of a Pearson 36 are dropping the vessel's 6,000-pound lead keel to inspect and replace the keel bolts, a project they have deferred for 10 years. The boat previously suffered grounding damage that caused the keel to wobble, leading the crew to reinforce the hull with five additional fiberglass floors. To prepare for the removal, the crew is grinding away layers of paint, fairing compound, and gel coat around the hull-keel joint to expose the connection. Inside the bilge, they are removing old resin and debris to access the keel bolt nuts, which require a deep-reach socket for removal. The plan involves bracing the keel from the outside, lifting the boat to separate the joint, and installing G10 backing plates to distribute the load for the new bolts. The crew is performing this work in a refit environment, using temporary air conditioning and protective suits to manage fiberglass dust during the grinding process.

Παρακολουθήστε στο YouTube

Σκάφη σε αυτό το βίντεο

Pearson Yachts 36Το σκάφος τους

Περισσότερα από το Sailing Uma

Making Our Small Cockpit Twice as Useful | Step 497Οκτ 2026We Ditched Our Steering Wheel (And Built Something Better) | Step 496Σεπ 2026We're Finally Setting Sail Again!Σεπ 20264 Hours to Rig Solar for an 8-Month Solo CircumnavigationΣεπ 2026

Από Sailing Uma — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος