Project Brupegβίντεο

9 days to go until the motor goes in - Project Brupeg Ep. 296

26 Μαρτίου 2023 · 22 λεπτά · 37K προβολές

Τι καλύπτει αυτό το βίντεο

Damien and the crew of the converted fishing trawler prepare the engine room and cabin spaces for a new motor installation scheduled in ten days.0:20 The project involves installing holding tanks, which requires extensive fiberglass work, fairing, and painting.0:20 Damien applies two layers of 128-gram glass to the tanks, fairing the surfaces with Jodomastic 90 epoxy and finishing them with Poly-U 400 two-pack polyurethane paint to prevent mold growth.1:53 The team also modifies cabin doors and drawer sliders, replacing old wheel-style hardware with ball-bearing sliders that feature push-lock fittings.7:27 To create sight glasses for the tanks, Damien experiments with epoxy and chopped strand mat fibers, ultimately opting for a clear resin pour after initial attempts with fibers failed to remain transparent.19:26 Additional tasks include routing shelf edges, sanding wall panels, and planning for future fuel transfer pipe modifications.6:44 The crew works around intermittent rain showers while finalizing the interior spaces before the engine arrives.14:07

Παρακολουθήστε στο YouTube

Περισσότερα από το Project Brupeg

Was the outboard rebuild worth it and Brupeg has developed a worrying noise... Project Brupeg Ep.456Αυγ 2026Three Builds, One Croc Sanctuary: Boat Life on Brupeg - Project Brupeg Ep.455Αυγ 2026Brupeg's 1st Drone, Green Island & Boatwork - Project Brupeg Ep.454Ιουλ 2026Good Mates & Boat Maintenance - Project Brupeg Ep.453Ιουλ 2026

Από Project Brupeg — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος