Acorn To Arabellaβίντεο

100 Days Until Boat Launch - Episode 259 - Acorn to Arabella: Journey of a Wooden Boat

31 Μαρτίου 2023 · 26 λεπτά · 145K προβολές

Τι καλύπτει αυτό το βίντεο

With 100 days remaining until launch, the crew at the shop is focusing on final interior joinery, electrical systems, and hull fairing for the wooden boat. Work on the interior includes installing cherry, oak, and cedar burl drawer fronts, fabricating cherry grab rails for the housetop, and finishing varnish on hatches and tables.2:25 Electrical progress involves mounting a Garmin navigation suite, including a plotter and radio, with a cable management strategy designed to accommodate a folding panel.15:30 To address limited space, the team fabricated a custom mount for a bilge float switch under the mast step.3:24 Exterior tasks include plugging ballast keel bolt pockets with locust wood and dolphinite, and rough-fairing the hull using a power planer and angle grinder to prepare for future caulking.16:58 Cold weather currently restricts the use of epoxy and bedding compounds, delaying the final installation of hatches and deck components until temperatures consistently exceed 40 degrees.16:18 The project remains on track for a June 17th launch date.0:51

Παρακολουθήστε στο YouTube

Περισσότερα από το Acorn To Arabella

Upgrading the Rudder and Another Trek To The CliffΑυγ 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South CoastΙουλ 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by SailboatΙουλ 2026Fjord Hopping | Arabella Sails East Toward The NuddickΙουλ 2026

Από Acorn To Arabella — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος