Project Brupegβίντεο
Building Boat Handrails - Brupeg Ep. 157
6 Ιουλίου 2020 · 35 λεπτά · 59K προβολές
Τι καλύπτει αυτό το βίντεο
Damien and Jess fabricate and install custom stainless steel handrails for the stairs leading into the freezer room of their converted fishing trawler, Brupeg.10:59 They use 32mm diameter stainless pipe with a 1.6mm wall thickness, utilizing 90-degree elbows to match the existing stair geometry.11:08 To ensure the rails appear level despite the boat’s curved deck, they measure and align the installation by eye rather than relying solely on deck-parallel measurements.27:12 The installation process involves tack-welding the rails in place before final MIG welding, followed by polishing the welds with 120-grit abrasives.10:58 To prevent rust in high-abrasion areas, they apply Jodacote 605, a high-build protective coating, to the surrounding steel.32:52 Additionally, the project includes solid, continuous welding of stabilizer sliders to prevent seawater ingress and future corrosion, a technique chosen over stitch welding to eliminate seams.1:16 The handrails replace a temporary ladder, marking a transition toward completing the vessel's interior accommodations.29:46
Περισσότερα από το Project Brupeg
Από Project Brupeg — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



