Project Brupegβίντεο
Maintenance & Improvements after Sea Trial One - Project Brupeg Ep.383
1 Δεκεμβρίου 2024 · 24 λεπτά · 29K προβολές · Gladstone
Τι καλύπτει αυτό το βίντεο
After completing a sea trial, the crew of the motorboat Brewpeg performs maintenance and system adjustments in Gladstone, Australia.0:03 The primary mechanical task involves recalibrating the throttle linkage to resolve a high-idle issue and ensure the engine reaches its rated 1850 RPM.3:49 A physical obstruction caused by an overly long screw in the throttle assembly prevented the lever from reaching its full idle stop; filing the screw down restored proper range.5:45 The crew also addresses heat management in the engine room, where temperatures reached 55 degrees Celsius during full-power operation, by planning exhaust insulation.3:01 To manage stern gland maintenance, they intend to install a catch tray to contain excess grease and reduce the output of the automatic greasing system.2:49 Additionally, the crew modifies the generator’s oil drainage system by extending a hose from the sump plug to a dedicated keel-based waste oil reservoir, allowing for cleaner oil changes.11:16 Proper throttle cable tension and consistent engine maintenance intervals are essential for reliable operation of a motor-dependent vessel.
Περισσότερα από το Project Brupeg
Από Project Brupeg — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



