Sailing Squibβίντεο
Squib's Refit - Installing LED strips - Empty conduit including cable pulling - All sorts of small...
17 Ιουλίου 2025 · 16 λεπτά · 667 προβολές
Τι καλύπτει αυτό το βίντεο
The refit of the boat Squib focuses on electrical installations and interior preparation ahead of a planned departure in 100 days.▶ 16:22 The host installs LED strips in the galley, utilizing aluminum channels and custom-soldered wiring to provide adjustable lighting controlled by a remote.▶ 2:56 Mounting these channels requires shortening the provided screws to 6mm to prevent them from protruding through the 8mm-thick mounting surface.▶ 4:28 In the port-side engine compartment, the host and a friend wire the engine and starter, installing a new battery and a cockpit-mounted switch.▶ 9:20 The host also prepares the forward cabin by laminating wooden support strips to the ceiling and routing electrical conduit through the bulkhead to accommodate future lighting.▶ 10:02 Additional tasks include sanding and fairing surfaces with epoxy in the forward cabin to prepare for insulation with Armaflex.▶ 11:18 The project concludes with the reinstallation of the steering wheel to verify clearance for the newly routed electrical cables.▶ 16:07
Περισσότερα από το Sailing Squib
Από Sailing Squib — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



