Sailing Squibβίντεο

Sailing Squib - We'll figure out the rest on the way - Iron Gates - Djerdap Lock 1 /14

22 Ιανουαρίου 2026 · 23 λεπτά · 1K προβολές · Orșova, Romania

Sailing past Iron Gate, sun breaks through clouds

Τι καλύπτει αυτό το βίντεο

A pocket catamaran navigates the Danube River through the Iron Gates gorge toward the Djerdap 1 hydroelectric dam.0:21 The crew encounters significant wind and current challenges while transiting the narrow, deep sections of the river.0:23 Because the vessel has already cleared customs into Romania, the crew is restricted to anchoring on the Romanian side, which offers poor protection from prevailing westerly winds.4:33 During a night at anchor, the boat experiences constant motion due to wind-against-current conditions.7:25

Approaching the Djerdap 1 lock, the starboard engine fails to start, leaving the vessel to maneuver in high winds with only one engine and an electric outboard.17:02 The crew identifies the cause as a faulty ignition switch connection, which they temporarily bypass with a screwdriver to restart the engine.21:23 They later determine the issue likely stemmed from using an incompatible key in the ignition switch.22:08 The vessel successfully transits the two-stage lock system, descending 30 meters total.18:54 The crew reports rising temperatures of 30°C and water temperatures of 25°C as they continue downstream.22:28

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Squib

Sailing Squib May 2026 /2Αυγ 2026Sailing Squib - Contemporary WitnessΙουλ 2026Sailing Squib - May 2026 /1Ιουλ 2026Sailing Squib - We'll take care of the rest on the way - Arrival in Mesolongi/ 33Ιουν 2026

Από Sailing Squib — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος