Sailing Umavideo

We're Cutting Off our Keel (Part 1 of 4) | Step 448

13 de julio de 2025 · 37 min · 142K vistas

¿Qué cubre este video?

The owners of a Pearson 36 are dropping the vessel's 6,000-pound lead keel to inspect and replace the keel bolts, a project they have deferred for 10 years. The boat previously suffered grounding damage that caused the keel to wobble, leading the crew to reinforce the hull with five additional fiberglass floors. To prepare for the removal, the crew is grinding away layers of paint, fairing compound, and gel coat around the hull-keel joint to expose the connection. Inside the bilge, they are removing old resin and debris to access the keel bolt nuts, which require a deep-reach socket for removal. The plan involves bracing the keel from the outside, lifting the boat to separate the joint, and installing G10 backing plates to distribute the load for the new bolts. The crew is performing this work in a refit environment, using temporary air conditioning and protective suits to manage fiberglass dust during the grinding process.

Ver en YouTube

Barcos en este video

Pearson Yachts 36Su barco

Más de Sailing Uma

Our boat won’t look the same after this | Step 495ago 2026The ONE Thing We Disagreed on This Entire Refit | Step 494ago 2026We Owe You The Full Storyjul 2026We spent $10,000 on something Pretty | Step 493jul 2026

De Sailing Uma — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema