Sampson Boat Covideo

Christmas special - Tally Ho present-day tour / updates!

24. desember 2023 · 23 min · 428K visninger

Hva denne videoen dekker

The restoration of the 1910 gaff cutter Tally Ho continues with significant progress on deck and interior systems. The crew recently received a hollow, lightweight topmast, which will be hoisted once the bowsprit is installed.0:39 Bob is currently fabricating a bowsprit step and a roller for the samson posts using a rare piece of lignum vitae donated by a supporter.4:26 Deck work also includes the installation of laminated teak winch bases and ongoing preparations for the original capstan, which is being rebuilt and motorized.7:04

Below deck, the electrical system is nearing completion, with Joe finishing the wiring for the 12-volt distribution panel and NMEA 2000 displays.8:56 The interior features new ash sole boards in the saloon, a custom cherry engine room seat, and a plumbed basin in the aft cabin.10:25 Heating system components, including copper piping and a diesel heater, are being installed throughout the vessel.12:24 Patrick constructed a sliding ladder for the forepeak, while Maya completed custom tufted leather settee cushions.15:52 The project remains focused on finishing the remaining deck hardware and rigging before launch.

Se på YouTube

Mer fra Sampson Boat Co

Sailing through the "Needles"okt. 2026Sailing the British South coast!sep. 2026Tally Ho meets a tidal mud-berth!sep. 2026Tally Ho sails into England after 59 years overseas!aug. 2026

Fra Sampson Boat Co – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem