MJ Sailingvideo

CATAMARAN BUILD - I Have A Large Cockpit (MJ Sailing - Ep 197)

1. august 2021 · 20 min · 90K visninger · Kent Island

Hva denne videoen dekker

Construction of a 42-foot MaxCruise catamaran continues at Kentmore Marina on Kent Island, where the builders install bulkhead six on both the port and starboard sides.2:22 To prevent the bulkheads from locking into the hull before permanent bonding, the crew places plastic bottles at the base during the dry-fit process, allowing for easier removal and trimming.8:09 Reinforcement of the bulkhead involves applying unidirectional fiberglass to the outer hull side and a combination of 090 and 12-ounce biaxial cloth above the aft bunk openings.0:05 For the final bonding, the crew uses cleats and clamped bars to maintain a plumb vertical line.17:43 They apply fillets with a 20mm radius using a custom-cut squeegee and secure the fiberglass with 12-ounce double-bias cloth in six-inch strips, overlapping the layers to ensure structural integrity.17:18 Separately, the crew applies a barrier coat to the bottom of a 31-foot Pacemaker powerboat using Total Boat products.12:19 Dry-fitting large structural components with temporary spacers prevents the panels from jamming in the hull during the alignment phase.8:17

Se på YouTube

Mer fra MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)aug. 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juli 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juni 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuni 2026

Fra MJ Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem