RAN Sailingvideo
Snowed In! But Our Sailboat Build Won't Wait - Ep. 378 RAN Sailing
12. januar 2024 · 19 min · 99K visninger · Skåne
Hva denne videoen dekker
Heavy snow and 50-knot winds in southern Sweden trap the crew at their farm for three days, delaying progress on their boat build.0:32 Once the road clears, work resumes in the barn, where temperatures drop to minus 10 degrees Celsius, causing ice to form on the hull.10:29 A diesel heater warms the workspace to allow for surface preparation.10:55 The hull requires cleaning to remove amine blush and sanding to ensure a fair finish.2:57 To prevent the coarse bi-axial fiberglass pattern from printing through the final paint, the crew prepares to apply a 110-gram twill weave fabric to the topsides.18:07 They use a jigsaw with a tungsten carbide blade and a router with a bearing to trim the fiberglass along the shear line.11:57 To manage the significant dust generated by manual sanding with longboards, they install a high-capacity air filtration system.14:35
Mer fra RAN Sailing
Fra RAN Sailing – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



