Sailing Yabávideo

Working Late: Fixing and Climbing the Mast in the Dark — Sailing Yabá 233

2. desember 2024 · 19 min · 48K visninger

Hva denne videoen dekker

The crew of Yabá shortens the backstay rigging to eliminate slack and improve tension, using SikaFlex and Loctite to secure the fittings.3:12 After sanding and painting the mast cap, they install a new anchor light and navigation light assembly.5:57 To automate the anchor light, they wire a photocell sensor into the 24-volt circuit, allowing the light to activate automatically at night.7:38 The installation requires climbing the mast after dark, using floodlights and head torches to complete the wiring connections and secure the assembly at the masthead.11:33 Testing confirms both the anchor light and navigation lights function correctly with the new sensor.13:06 The project concludes with the masthead components fully installed and operational.

Se på YouTube

Mer fra Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaug. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem