Sailing Umavideo

Our New Raw Water System Failed. So We Built a Better One | Step 481

5. april 2026 · 33 min · 104K visninger

Hva denne videoen dekker

A sailboat refit project requires consolidating multiple raw water intakes into a single, bulkhead-mounted manifold system to improve safety and simplify maintenance.0:17 The installation centers on a raw water strainer located below the waterline, necessitating a robust, pressure-tested housing.1:14 Initial attempts using a stainless steel Vetus strainer failed during pressure testing when the non-captive neoprene gasket expanded and leaked at approximately 20 to 30 PSI.9:39 A subsequent upgrade to a solid cast bronze Guidi strainer provided the required reliability, featuring a captive O-ring channel and a Lexan cover.15:49 The transition to bronze components required a complete redesign of the cockpit locker plumbing layout to accommodate different inlet and outlet orientations while maintaining a compact footprint.17:35 The system supports three distinct pumps for HVAC, watermaking, and saltwater washdown.0:34 Successful pressure testing at 60 PSI confirmed the integrity of the new bronze manifold and fittings, though the reconfiguration remains an ongoing challenge due to space constraints and the length of bronze plumbing components.20:56

Se på YouTube

Mer fra Sailing Uma

The ONE Thing We Disagreed on This Entire Refit | Step 494aug. 2026We Owe You The Full Storyjuli 2026We spent $10,000 on something Pretty | Step 493juli 2026We Covered Our Boat in Solar. Is It Enough? | Step 492 (Part 3)juli 2026

Fra Sailing Uma – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem