Tips from a Shipwrightvideo

Building the TotalBoat: Fastening the chines (Episode 9)

25. august 2016 · 10 min · 357K visninger

Hva denne videoen dekker

Fastening chine logs to a wooden skiff requires precise alignment to avoid driving screws through the top bevel of the timber.0:32 To ensure accuracy, a custom-made wooden gauge slides along the chine to mark two parallel lines for screw placement.0:50 After marking the lines, the crew spaces screws four inches apart in a staggered pattern along the length of the chine.2:15 Polysulfide bedding compound is applied to the chine log using a toothed trowel to ensure even coverage before clamping the log into position.2:31 The team uses number 12 galvanized slotted screws, pre-drilling with a tapered bit and a modified countersink to allow the screw heads to sit flush without requiring large wooden plugs.4:10 A custom-ground screwdriver bit, used with an extension, prevents the bit from slipping or damaging the surrounding wood during installation.6:18 Finally, the side planks are trimmed flush to the transom using a hand saw guided by a reference line and finished with a block plane.8:53

Se på YouTube

Mer fra Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmars 2026Progressive Bevelingfeb. 20261958 Harley Davidson Panhead Motorcycle - For Salefeb. 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesjan. 2026

Fra Tips from a Shipwright – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem