Acorn To Arabellavideo
Acorn to Arabella - Journey of a Wooden Boat - Episode 119: Getting Ready for a Big Change
10. juli 2020 · 33 min · 175K visninger
Hva denne videoen dekker
Construction of the wooden boat Arabella involves fairing sawn frames, cutting the rabbet, and installing cedar hull planks.0:07 The crew creates 40-foot planking patterns by squaring the ends and striking a straight edge using a string line, square, and long ruler.1:14 After removing hull ribbons to accommodate the first cedar plank, the team uses bar clamps to pull the plank into position against the molds.5:42 When the cedar requires bending at the stern, the crew uses a steam box powered by a turkey fryer burner.15:02 A solenoid failure in the burner forces a search for a replacement part at local retailers, eventually sourced from Cabela’s.15:32 The process requires careful handling of the cedar to avoid dents and splitting.10:01 For tool maintenance, the shop uses a Work Sharp system for quick edge touch-ups on chisels used for cutting white oak, reserving manual honing with Lee Valley jigs and Arkansas stones for finer finish work.25:46
Mer fra Acorn To Arabella
Fra Acorn To Arabella – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



