Sailing Umavideo

You Don't Know If You Don't Try | Step 399

12. juli 2024 · 30 min · 112K visninger

Hva denne videoen dekker

The crew of the sailboat Uma continues a major interior refit, focusing on installing a new central bulkhead to divide the head and the corridor leading to the V-berth.14:16 To ensure the bulkhead remains rigid and flat, they laminate fiberglass onto thin plywood sheets, sandwiching the assembly between weights on a flat concrete surface to cure.21:18 This composite structure replaces a flexible, unsupported partition, allowing for a more efficient layout that includes a dedicated shower and relocated battery bank under the starboard-side nook.1:28 The process involves grinding existing fiberglass, relocating a knot log and depth sounder transducer, and using full-scale templates to verify fitment before final installation.15:40 The team also addresses fitness and accountability by using the Trainwell platform to maintain a consistent workout routine while living and working at the shipyard.10:03

Se på YouTube

Mer fra Sailing Uma

We're Finally Setting Sail Again!sep. 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsep. 2026Solar Sponsor Backed Out Before Sailing Around the World !sep. 2026Our boat won’t look the same after this | Step 495aug. 2026

Fra Sailing Uma – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem