Sailing Squibvideo

Squib´s Refit - Permanently mounting roof supports - Installing the galley permanently - Adjusting drawers /103

23. januar 2025 · 15 min · 1K visninger

Hva denne videoen dekker

Peter and Sabina install a new kitchen cabinet unit and custom drawers aboard their boat, *Squib*.1:29 The installation requires significant modification to the drawer frames, as the hull’s curvature and the uneven bulkhead prevent the unit from sitting flush against the interior wall. Peter grinds down the rear corners of the drawers to accommodate the narrowing hull shape, while Sabina applies Sikaflex sealant to secure the cabinet structure.4:11 The team uses epoxy thickened with Aerosil and microballoons to fill gaps and seal the unit against the bulkhead.0:46 After multiple test-fits and adjustments to the drawer depths, the unit is successfully aligned and secured.9:41 The project concludes with the cabinet installation, though Peter notes that additional structural reinforcement, including laminating a fillet to the center bulkhead, remains for a future session.14:51 Peter also plans to repurpose leftover wood strips from a recently completed rub rail project to replace the stern railing.15:31

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem