Expedition Engineeringvideo

HUGE Milestone- Carbon Fiber Hardtop and Hard Dodger Installed (13)

18. januar 2025 · 27 min · 77K visninger

Hva denne videoen dekker

Fabricating a custom carbon fiber hardtop and hard dodger for a sailboat involves extensive shop-based composite work, including sanding, fairing, and multiple carbon fiber layups. The process requires creating foam-core molds for complex shapes, such as rain gutters and window framing, which are then reinforced with carbon fiber and epoxy. The team uses PVC pipe as a mandrel to create custom conduits for wiring, which are later integrated into the structure. After curing, the large, awkward components are transported to the boat for final installation.25:15 The rear arch is temporarily mounted using the boom for support, then permanently bolted through the deck.10:51 The team faces challenges with material adhesion, specifically hot glue failing during the curing process, and the physical difficulty of maneuvering large, lightweight but bulky composite structures.18:24 The project concludes with the successful placement of the hardtop on the boat, requiring precise alignment and structural bonding to the deck.27:14

Se på YouTube

Mer fra Expedition Engineering

The Reason We’ve Changed (27)aug. 2026One Year Update - Custom Carbon Fiber Hardtop (26)juli 2026Wake-Up Call: The Critical Failure That Could Have Been VERY BAD (25)juni 2026Our Boat Kept Getting Slower. This Was Why. (24)juni 2026

Fra Expedition Engineering – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem