Sailing Yabávideo

When Boat Projects Go Wrong: Boiler troubles — Sailing Yabá 241

10. desember 2024 · 16 min · 44K visninger · Brazil

Hva denne videoen dekker

The crew of Yabá installs a hybrid electric and engine-heated water boiler in the engine room to provide hot water for the first time since moving aboard.6:42 They mount the unit in a tight space behind the freezer, routing hot water lines from the shower area through the bulkhead and using push-to-connect plumbing fittings.3:59 The electrical installation involves connecting the boiler to a 220V power source, drawing approximately 1400 watts during operation.14:48 While the plumbing system successfully holds pressure and fills the tank without leaks, the heating element fails to sustain operation, shutting down after 20 seconds of use.15:28 The crew defers further troubleshooting until the following day, leaving the engine-heating plumbing connections for a future project.9:06 The installation confirms that while the plumbing and electrical circuits are functional, the boiler unit requires additional diagnostic work to resolve the power-cycling issue.

Se på YouTube

Mer fra Sailing Yabá

Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing Yabásep. 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing Yabásep. 2026Flying Across the Caribbean for Yabá’s Biggest Upgrade Yet — Sailing Yabásep. 2026Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaug. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem