Acorn To Arabellavideo

Acorn to Arabella - Journey of a Wooden Boat - Episode 81: Sawn Frames and Cedar Rack

27. september 2019 · 22 min · 149K visninger · Worcester, Massachusetts

Hva denne videoen dekker

Construction of the wooden boat Arabella continues with the fabrication and installation of three sawn frames in the stern.Watch The process involves springing ribbons to create patterns, roughing out shapes on a bandsaw, and running pieces through a thickness planer.3:34 Because the stern frames stand vertically, the bevel angles remain consistent, simplifying the welding of the bronze floors compared to the curved stem.6:10 The crew notches the stern post to create a flat mounting surface for the floor plates and cuts wings off the frames to form limber holes for bilge drainage.13:05 While metalwork proceeds, the team constructs an outdoor rack to store and air-dry cedar planking stock.9:30 With the sawn frames and bronze floors installed in both the stem and stern, the hull remains supported by molds until the planking is complete, at which point the final seven pairs of bent frames will be added.20:53 Proper pattern marking and iterative adjustments ensure the frames fit the specific geometry of the stern post.

Se på YouTube

Mer fra Acorn To Arabella

Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellasep. 2026Upgrading the Rudder and Another Trek To The Cliffaug. 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuli 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboatjuli 2026

Fra Acorn To Arabella – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem