Em & Nickvideo
Building the Bilge system of our DREAMS (...again lol)
13. september 2026 · 29 min · 13K visninger
Hva denne videoen dekker
Replacing bilge hoses on an Island Packet requires using wire-reinforced wet exhaust hose to prevent kinking and ensure durability, rather than standard bilge hose.1:00 After initially cutting lines too short to accommodate proper anti-siphon loops, the crew pulls new 25-foot hose runs through the bilge using a wooden dowel and drywall screw technique to connect old and new lines.0:37 The project involves replacing Whale Gusher pumps and upgrading to 316 stainless steel smooth-band hose clamps to prevent hose damage and corrosion.22:33 To manage future maintenance, the owners create a digital hose and through-hull schedule documenting IDs, lengths, sizes, and connection points.23:23 During the process, a professional inspection confirms the presence of drywood termites in the boat's lockers, which can be treated via tenting or by sealing the vessel while in the water.17:48 The crew prioritizes essential repairs for safety over total system replacement to avoid delaying the boat's launch.24:48
Mer fra Em & Nick
Fra Em & Nick – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



