sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn
sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026

HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn

Sailing Uma · video

We Ignored Marine Electrical Code… Here’s Why | Step 482

12. april 2026 · 30 min · 108K visninger

Crew wiring electrical panel inside tight boat space

Se på YouTube

Hva denne videoen dekker

The electrical system upgrade on this vessel focuses on a multi-tiered AC charging setup designed to handle diverse international shore power standards. The installation utilizes a Victron MultiPlus inverter-charger for high-amperage 230V shore power, supplemented by two smaller Victron smart battery chargers capable of accepting 120V to 240V at 50Hz or 60Hz.▶ 3:16 To mitigate galvanic corrosion, the system incorporates a galvanic isolator on the shore power ground line rather than a heavy isolation transformer.▶ 1:32 The crew installed an RCBO (residual current breaker with overcurrent protection) to provide ground fault protection for the entire AC circuit.▶ 0:46 During the installation, the owners opted to use tinned, stranded copper wire for AC runs, adhering to the more stringent ABYC guidelines rather than the European ISO standards, which permit standard stranded copper in watertight enclosures.▶ 13:08 The project concludes with the successful verification of 230V shore power input, though final completion of the AC distribution box awaits the arrival of specific breakers from Norway.▶ 28:47

Mer fra Sailing Uma

Uma is Ready to Launch! (But there's a catch) | Step 489juni 2026How Many Sails Does it Take To Replace a Diesel Engine? | Step 488mai 2026Turning Our Powerboat Back Into a Sailboat | Step 487mai 2026We Cut our Mast in Half | Step 486mai 2026

Fra Sailing Uma – se kanalens båt, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026