Sailing Squibvideo

Squib's Refit - Installing the bulkhead partitions - Building doors for the technical wall in the aft cabin /59

21. mars 2024 · 19 min · 781 visninger

Hva denne videoen dekker

Peter and Sabina continue the refit of their pocket catamaran, Squib, by installing structural bulkheads in the starboard hull to support a new freezer unit.0:16 To ensure structural integrity, Peter cuts plywood bulkheads to size and fixes them parallel using wooden spacers before bonding them with thickened epoxy.2:43 He applies three layers of 10–12 cm wide fiberglass matting over the epoxy fillets to secure the bulkheads to the hull.6:57 During the curing process, he maintains a 10-degree Celsius environment using a 1000-watt electric heater, supplemented by solar power.9:46 To prevent hull deformation while working, he places temporary floorboards across the bilge.10:06 Separately, Peter constructs a louvered door frame for the aft cabin to conceal technical wiring and equipment.14:38 He modifies the frame to accommodate the slight curvature of the bulkhead and installs four discounted louvered doors using standard hinges.14:57 The project concludes with the installation of 2 cm Styrodur insulation into the freezer compartment housing.19:04

Se på YouTube

Mer fra Sailing Squib

Sailing Squib - May 2026/3sep. 2026Sailing Squib May 2026 /2aug. 2026Sailing Squib - Contemporary Witnessjuli 2026Sailing Squib - May 2026 /1juli 2026

Fra Sailing Squib – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem