Catamaran Mistertong video

#201 Start of the work... getting our bearings... Shipyard day 1 and 2

17. mars 2026 · 49 min · 8K visninger

Couple on catamaran deck with dry docked boat in background

Hva denne videoen dekker

The owners of an Outremer catamaran begin a multi-month haul-out project, prioritizing structural repairs to the forward compression beam and bow sections.5:40 During the first two days at the yard, the crew removes the trampolines and lowers the compression beam using the mainsail and gennaker halyards as a makeshift crane system.18:44 Initial tasks include establishing a temporary gray-water drainage system for the galley sink and sourcing electrical adapters to connect the boat to shore power.1:57 The planned scope of work is extensive, covering the replacement of through-hull fittings, maintenance on the saildrive seals, and a full application of Coppercoat antifouling.34:43 The crew also intends to modify the transom steps and repair the dinghy, though these tasks remain secondary to the structural integrity of the beam and bow.29:03 The project schedule remains flexible, with the crew prioritizing essential repairs to ensure the vessel meets its deadline for relaunch.

Se på YouTube

Mer fra Catamaran Mistertong

#245 The break didn't last very long…aug. 2026#244 Worrying: Our boats held hostage in the Caribbeanaug. 2026#243 Locked in until when???aug. 2026#242 The engine is no longer spitting!!!aug. 2026

Fra Catamaran Mistertong – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem