Acorn To Arabellavideo

Three Fiberglass Projects - Episode 188 - Acorn to Arabella: Journey of a Wooden Boat

19. november 2021 · 24 min · 105K visninger · New England

Hva denne videoen dekker

Steve and his crew at Acorn To Arabella fabricate three fiberglass components for their wooden boat build at Narwhal Labs, a public makerspace operated by Total Boat.7:12 The projects include a custom refrigerator and freezer unit, an anchor locker for the forepeak, and a sole for the head.3:57 To build the refrigerator, Steve constructs a plug from scrap wood crates, wraps it in packing tape as a release agent, and applies 12-ounce biaxial cloth with slow-hardening epoxy.5:49 The anchor locker project involves glassing over a plywood core, using relief cuts in the fabric to manage compound curves and corners.19:02 For the head sole, the team uses cedar boards and applies peel-ply fabric over the final layer to create a textured, non-slip surface after curing.21:30 The team utilizes fillets and fiberglass tape to reinforce corners, prioritizing structural integrity for the refrigerator and durability for the chain-heavy anchor locker.9:37 The process confirms that fiberglass is an effective, complementary material for specific high-wear or waterproof areas within a wooden boat build.22:27

Se på YouTube

Mer fra Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againokt. 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellasep. 2026Upgrading the Rudder and Another Trek To The Cliffaug. 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuli 2026

Fra Acorn To Arabella – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem