Sailing Doodlesvideo

My New Boat Was Damaged… 12 Days Before Launch!

1. mai 2026 · 14 min · 169K visninger · Pattaya

Man inspects catamaran hull in boatyard under bright sun

Hva denne videoen dekker

Construction of an Island Spirit 525 catamaran continues at the factory in Pattaya, Thailand, with a scheduled launch date approximately 12 days after April 30.0:07 The vessel is currently undergoing final electrical commissioning, bottom painting, and interior trim installation.3:36 A replacement boom for the Selden in-mast electric furling system was sourced after the original unit sustained damage during transport from Malaysia.0:50 The build includes a custom camera surveillance system integrated into the chart plotter, a full-size refrigerator, and a specialized server rack for recording equipment.3:03 The factory is also installing a freshwater wash-down line for the anchor locker and utilizing soft-density mattresses in the cabins.9:07 Following factory completion, the boat will be transported by road to a marina for mast stepping, keel attachment, and hardtop installation.12:31 The owner plans to remain in the area to document the transport process before the vessel enters the water for initial sea trials.12:41

Se på YouTube

Mer fra Sailing Doodles

I'm Buying a POWER YACHT?! Touring the Annapolis Boat Show 2026okt. 2026Meet DESTINY! My New Sailing Crew Arrives!okt. 2026Engine Alarm, Water Leak & a Nightmare Repair Before We Sailokt. 2026Finally Launched the Boat… Then the Engine Alarm Went Offsep. 2026

Fra Sailing Doodles – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem