sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn
sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026

HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn

RAN Sailing · video

The Last Major Lamination on Our 52ft Sailboat! - Ep. 491 Ran Sailing

12. juni 2026 · 23 min · 95K visninger · Karlstads kommun, Sweden

Man lifts deckhouse panel onto 52ft sailboat hull

Se på YouTube

Hva denne videoen dekker

Johan completes the final major lamination for the deckhouse roof of a 52ft sailboat.▶ 16:05 The project involves constructing five large roof panels totaling 13 square meters.▶ 1:19 Each panel requires three layers of 600-gram biaxial fiberglass on both sides, reinforced with carbon fiber, utilizing approximately 50 to 55 kilograms of glass and carbon and 40 to 45 kilograms of epoxy.▶ 1:26 To ensure structural integrity and a smooth finish, each piece is cured in a mold under vacuum pressure for six to seven hours, assisted by heating blankets.▶ 12:08 The process is completed over five days to prepare the workspace for an upcoming open house.▶ 1:43 The finished roof features a slight curve for structural support and includes planned cutouts for a sliding hatch, a garage, and deck hatches for ventilation and sail visibility.▶ 16:24 The deckhouse design prioritizes 360-degree visibility and interior volume, with the main helm station positioned on the starboard side.▶ 19:15

Mer fra RAN Sailing

Port Side Toe Rail & Deckhouse Carbon Corners - Ep. 494 Ran Sailingjuli 2026The Boat Gets Its Edge - Ep. 493 Ran Sailingjuni 2026Opening Up The Deckhouse: The Last Window Cutout - Ep. 492 Ran Sailingjuni 2026Deckhouse Roof Build - This Mistake Would Have Been Costly - Ep. 490 Ran Sailingjuni 2026

Fra RAN Sailing – se kanalens båt, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026