Gone with the Wynnsvideo

The Shakedown Sail, BREAKING (in) A New Boat

August 27, 2023 · 27 min · 249K views · Koh Samui

What this video covers

A shakedown cruise on a new catamaran reveals the logistical and technical challenges of commissioning a vessel, including identifying warranty items, optimizing system configurations, and adapting to new sailing techniques. The crew encounters common teething issues such as improperly mounted dinghy lifting points, ceramic bowls that damage countertops, and the need for a PC to interface with the C-Zone digital switching system.1:34 Operating a continuous line furling system requires specific coordination on both port and starboard lines, a departure from traditional monohull headsail setups.16:32 The vessel, hull number two of its model, requires constant communication with the manufacturer to address design flaws discovered during active use.26:23 Managing power consumption, particularly with solar output and air conditioning loads, remains a primary focus during the initial break-in period.14:09 The experience highlights the emotional and physical exhaustion of transitioning to a new boat, emphasizing the importance of patience and realistic expectations during the first weeks of ownership.26:17

Watch on YouTube

More from Gone with the Wynns

This Cost a Fortune... We Removed It AnywayJun 2026We Thought We'd Never See These AgainMay 2026600 Miles Across the Most Feared Ocean on EarthMay 2026Ice Camping Overnight on AntarcticaMay 2026

From Gone with the Wynns — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue