Catamaran Mistertong βίντεο
#135 Between work meetings and small chores…
2 Αυγούστου 2025 · 39 λεπτά · 6K προβολές · Le Marin, Martinique
Τι καλύπτει αυτό το βίντεο
Djé and Nad finalize cockpit and storage locker modifications on their catamaran, specifically addressing drainage issues that previously allowed water to pool inside the lockers.▶ 0:03 Djé drills new drainage holes through the gutter and nacelle, sealing the exposed edges with epoxy resin to prevent water intrusion and structural rot.▶ 0:39 He installs flexible PVC tubing to direct water away from the lockers, consolidating multiple drainage points into a single, efficient system.▶ 1:06 The project concludes with the installation of protective trim around the new openings to prevent chafing and improve aesthetics.
While completing these repairs, the crew prepares for an upcoming haul-out and refit period, estimated to last at least five weeks.▶ 1:42 They are currently sourcing materials, including wood and resin, locally in Le Marin, Martinique, to avoid the higher costs and lower quality of supplies found further south in the Grenadines.▶ 2:28 Djé also pursues local employment opportunities to fund these maintenance projects.▶ 3:13 The crew balances these boat tasks with daily life at anchor, including provisioning, cooking, and managing administrative paperwork.▶ 20:38
Περισσότερα από το Catamaran Mistertong
Από Catamaran Mistertong — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



