Catamaran Mistertong vidéo
#135 Between work meetings and small chores…
2 août 2025 · 39 min · 6K vues · Le Marin, Martinique
Ce que couvre cette vidéo
Djé and Nad finalize cockpit and storage locker modifications on their catamaran, specifically addressing drainage issues that previously allowed water to pool inside the lockers.▶ 0:03 Djé drills new drainage holes through the gutter and nacelle, sealing the exposed edges with epoxy resin to prevent water intrusion and structural rot.▶ 0:39 He installs flexible PVC tubing to direct water away from the lockers, consolidating multiple drainage points into a single, efficient system.▶ 1:06 The project concludes with the installation of protective trim around the new openings to prevent chafing and improve aesthetics.
While completing these repairs, the crew prepares for an upcoming haul-out and refit period, estimated to last at least five weeks.▶ 1:42 They are currently sourcing materials, including wood and resin, locally in Le Marin, Martinique, to avoid the higher costs and lower quality of supplies found further south in the Grenadines.▶ 2:28 Djé also pursues local employment opportunities to fund these maintenance projects.▶ 3:13 The crew balances these boat tasks with daily life at anchor, including provisioning, cooking, and managing administrative paperwork.▶ 20:38
Plus de vidéos de Catamaran Mistertong
De Catamaran Mistertong — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.