Tips from a Shipwrightβίντεο

Building the TotalBoat: Springing the boat together (Episode 7)

11 Αυγούστου 2016 · 9 λεπτά · 945K προβολές

Τι καλύπτει αυτό το βίντεο

Louis Sauzedde demonstrates the assembly of a wooden skiff by springing the side planks against a single temporary station, a stem, and a transom.3:06 To manage a slight cup in the wide transom board, he uses bar clamps and water to swell the wood fibers, ensuring a flat, tight fit before permanent fastening.1:33 He mounts the assembly at a 42-inch working height to facilitate efficient construction.2:31 The process begins by dry-fitting the side planks to the stem and transom, drilling pilot holes, and then applying bedding compound before final attachment with 2-inch number 12 galvanized screws.5:11 He uses a bevel set and electric plane to tune the transom bevels to the planking angle.6:20 After securing the planks to the stem and transom, he uses a cross-brace to pull the midships beam to 5 feet 11 inches.8:01 The sequence concludes with plans to install chines and vertical framing before flipping the hull to complete the bottom and gunnels.8:06

Παρακολουθήστε στο YouTube

Περισσότερα από το Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEΜαρ 2026Progressive BevelingΦεβ 20261958 Harley Davidson Panhead Motorcycle - For SaleΦεβ 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale LinesΙαν 2026

Από Tips from a Shipwright — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος