Tips from a Shipwrightvidéo

Building the TotalBoat: Springing the boat together (Episode 7)

11 août 2016 · 9 min · 945K vues

Ce que couvre cette vidéo

Louis Sauzedde demonstrates the assembly of a wooden skiff by springing the side planks against a single temporary station, a stem, and a transom.3:06 To manage a slight cup in the wide transom board, he uses bar clamps and water to swell the wood fibers, ensuring a flat, tight fit before permanent fastening.1:33 He mounts the assembly at a 42-inch working height to facilitate efficient construction.2:31 The process begins by dry-fitting the side planks to the stem and transom, drilling pilot holes, and then applying bedding compound before final attachment with 2-inch number 12 galvanized screws.5:11 He uses a bevel set and electric plane to tune the transom bevels to the planking angle.6:20 After securing the planks to the stem and transom, he uses a cross-brace to pull the midships beam to 5 feet 11 inches.8:01 The sequence concludes with plans to install chines and vertical framing before flipping the hull to complete the bottom and gunnels.8:06

Regarder sur YouTube

Plus de vidéos de Tips from a Shipwright

Building Orca - Ep. 23: Mold FIVEmars 2026Progressive Bevelingfévr. 20261958 Harley Davidson Panhead Motorcycle - For Salefévr. 2026Building Orca - Ep. 22: Lofting Pt. 3 - Full Scale Linesjanv. 2026

De Tips from a Shipwright — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème