Entre Terras e Maresβίντεο

Finally, we defined the steering wheel position. T1.ep168

1 Μαρτίου 2026 · 17 λεπτά · 817 προβολές

Τι καλύπτει αυτό το βίντεο

Edgar and Sâmia are constructing a custom steering pedestal and navigation station cabinet for their Delta 41 refit.0:12 The project centers on positioning a 70cm fiberglass steering wheel from Project Sail to ensure ergonomic clearance for the operator while standing.4:19 Edgar built the cabinet structure to house electrical components, including an inverter and battery charger, while incorporating a dedicated compartment for the hydraulic steering pump and engine throttle controls.12:49 The design includes a removable floor panel that doubles as a step, providing the crew with an elevated vantage point to see over the cabin windows while maintaining access to the engine's heat exchanger for maintenance.5:57 The team used a router and custom guides to adjust the fit of the cabinet doors after initial cutting errors.6:47 Future steps include bonding the structure with epoxy, installing latches, and applying final finishes.13:24 The layout successfully integrates the steering station into the pilot house, providing a clear line of sight for navigation while preserving interior cabin space.16:42

Παρακολουθήστε στο YouTube

Προβάλλεται στους οδηγούς του στόλου

Περισσότερα από το Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Ιουλ 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Ιουν 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Ιουν 2026This week the focus was on something elseΙουν 2026

Από Entre Terras e Mares — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος