Sailing Squibβίντεο

Squib's Refit - Episode 49

11 Ιανουαρίου 2024 · 15 λεπτά · 857 προβολές

Τι καλύπτει αυτό το βίντεο

Peter continues the refit of the pocket catamaran Squib, focusing on deck hardware, electrical systems, and interior organization. He installs two new water deck fills by sanding the fiberglass, applying thickened epoxy, and sealing the fittings with Sikaflex.0:53 To allow the sealant to cure properly, he leaves the mounting screws slightly loose for a final tightening later.3:48 He also bonds a battery box in place using thickened epoxy, ensuring it is level before the adhesive sets.4:32

On the exterior, Peter connects two additional solar panels in series.9:28 He manages the installation alone by securing the panels at accessible points, though he notes that full mounting requires a second person to reach fasteners from both sides.7:57 He also tests the diesel heater, which raises the cabin temperature by 10 degrees within 10 minutes.12:11 Interior tasks include removing an old bathroom sink, clearing space for a new electrical panel near the helm, and organizing tools and materials into labeled storage bins to reduce clutter.6:44 He concludes by measuring and cutting wood trim for a new frame in the aft cabin.14:55

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Squib

Sailing Squib - May 26 Part 5 Starting to tailor the cockpit cover, water pump replacement starboard engineΟκτ 2026Sailing Squib - May 2026 /4Οκτ 2026Sailing Squib - May 2026/3Σεπ 2026Sailing Squib May 2026 /2Αυγ 2026

Από Sailing Squib — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος