Sailing Squibvidéo
Squib's Refit - Episode 49
11 janvier 2024 · 15 min · 857 vues
Ce que couvre cette vidéo
Peter continues the refit of the pocket catamaran Squib, focusing on deck hardware, electrical systems, and interior organization. He installs two new water deck fills by sanding the fiberglass, applying thickened epoxy, and sealing the fittings with Sikaflex.0:53 To allow the sealant to cure properly, he leaves the mounting screws slightly loose for a final tightening later.3:48 He also bonds a battery box in place using thickened epoxy, ensuring it is level before the adhesive sets.4:32
On the exterior, Peter connects two additional solar panels in series.9:28 He manages the installation alone by securing the panels at accessible points, though he notes that full mounting requires a second person to reach fasteners from both sides.7:57 He also tests the diesel heater, which raises the cabin temperature by 10 degrees within 10 minutes.12:11 Interior tasks include removing an old bathroom sink, clearing space for a new electrical panel near the helm, and organizing tools and materials into labeled storage bins to reduce clutter.6:44 He concludes by measuring and cutting wood trim for a new frame in the aft cabin.14:55
Plus de vidéos de Sailing Squib
De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



