3/PRE-TEST WORK

16 Φεβρουαρίου 2025 · 13 λεπτά · 2K προβολές

Τι καλύπτει αυτό το βίντεο

The hull maintenance project involves treating osmosis blisters, replacing four through-hull fittings, and applying anti-fouling paint.0:06 To address osmosis, the hull is sanded to open blisters, cleaned with acetone, and filled with a two-part epoxy mixture.0:35 After the first epoxy layer cures and shrinks, a second layer is applied to ensure a smooth, sealed surface.2:10 Four corroded through-hull valves are removed using a hammer and chisel.4:19 New fittings are installed by enlarging the hull openings with a sanding drum to ensure the backing nut sits flush against the fiberglass.7:27 A dry fit is performed to orient the valves correctly, followed by a final installation using Sika sealant to ensure watertight integrity.8:45 The process concludes with the application of a primer and anti-fouling paint.12:29 The project highlights the necessity of proper tools and the time-intensive nature of hull restoration for a novice boat owner.

Παρακολουθήστε στο YouTube

Περισσότερα από το CAPTAIN ZIANE

Leaving Béjaïa, heading to El Aouana! Before I leave Béjaïa... the paradise of Cap Carbon.Οκτ 2026Extraordinary place! My village and its mountains. Memories of my childhood.Σεπ 2026Customs seized my boat in Béjaïa. A moment I'll never forget! I wasn't expecting that.Σεπ 2026An incredible encounter in Collo, Algeria | Then departing for Béjaïa ⛵ I will be back!Σεπ 2026

Από CAPTAIN ZIANE — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος