CAPTAIN ZIANEvidéo

3/PRE-TEST WORK

16 février 2025 · 13 min · 2K vues

Ce que couvre cette vidéo

The hull maintenance project involves treating osmosis blisters, replacing four through-hull fittings, and applying anti-fouling paint.0:06 To address osmosis, the hull is sanded to open blisters, cleaned with acetone, and filled with a two-part epoxy mixture.0:35 After the first epoxy layer cures and shrinks, a second layer is applied to ensure a smooth, sealed surface.2:10 Four corroded through-hull valves are removed using a hammer and chisel.4:19 New fittings are installed by enlarging the hull openings with a sanding drum to ensure the backing nut sits flush against the fiberglass.7:27 A dry fit is performed to orient the valves correctly, followed by a final installation using Sika sealant to ensure watertight integrity.8:45 The process concludes with the application of a primer and anti-fouling paint.12:29 The project highlights the necessity of proper tools and the time-intensive nature of hull restoration for a novice boat owner.

Regarder sur YouTube

Plus de vidéos de CAPTAIN ZIANE

Extraordinary place! My village and its mountains. Memories of my childhood.sept. 2026Customs seized my boat in Béjaïa. A moment I'll never forget! I wasn't expecting that.sept. 2026An incredible encounter in Collo, Algeria | Then departing for Béjaïa ⛵ I will be back!sept. 2026Storm and fog at Cape Bougaroun: I can no longer see the waves coming!sept. 2026

De CAPTAIN ZIANE — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème