Ravenswingβίντεο
Farrier F25C trimaran makeover week 1
6 Αυγούστου 2023 · 25 λεπτά · 2K προβολές
Τι καλύπτει αυτό το βίντεο
A Farrier F25C trimaran undergoes structural modifications to its float decks and bow section to improve net lashing and rigging attachment points.0:06 The project begins by shaping foam strips to create new net lashing tubes, which are bonded to the hulls using a mixture of epoxy, lightweight balloons, and cabosil.0:11 After fairing the foam, the tubes are reinforced with carbon fiber strips applied via vacuum bagging, using peel ply and perforated metering film to control resin content.8:50
The bow section requires cutting into the deck to access and remove the original bow chain plate, which is replaced by a Dyneema loop and low-friction ring system for the forestay and jib tack.19:46 The deck cutout is patched with carbon fiber reinforcement.22:40 Additional tasks include fabricating new cockpit combing boxes from scrap wood, filling a former solar vent hole on the forward hatch, and repairing the pop-top hatch by removing old interior lining and reinforcing damaged fiberglass.24:58 These modifications prepare the vessel for final fairing and painting.
Περισσότερα από το Ravenswing
Από Ravenswing — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



