Ravenswingvideo

Farrier F25C trimaran makeover week 1

6 August 2023 · 25 min · 2K views

What this video covers

A Farrier F25C trimaran undergoes structural modifications to its float decks and bow section to improve net lashing and rigging attachment points.0:06 The project begins by shaping foam strips to create new net lashing tubes, which are bonded to the hulls using a mixture of epoxy, lightweight balloons, and cabosil.0:11 After fairing the foam, the tubes are reinforced with carbon fiber strips applied via vacuum bagging, using peel ply and perforated metering film to control resin content.8:50

The bow section requires cutting into the deck to access and remove the original bow chain plate, which is replaced by a Dyneema loop and low-friction ring system for the forestay and jib tack.19:46 The deck cutout is patched with carbon fiber reinforcement.22:40 Additional tasks include fabricating new cockpit combing boxes from scrap wood, filling a former solar vent hole on the forward hatch, and repairing the pop-top hatch by removing old interior lining and reinforcing damaged fiberglass.24:58 These modifications prepare the vessel for final fairing and painting.

Watch on YouTube

More from Ravenswing

F32R carbon tri build project for saleOct 2026A Labrador & her people go sailingDec 2025An Uncle meets his Nephew sailing, part 2Nov 2025An uncle meets his nephew during a sailing cruiseOct 2025

From Ravenswing — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue