TURNING A WILD CLIFFSIDE INTO MY DREAM A-FRAME CABIN (WITH NO EXPERIENCE)
29 Ιουνίου 2025 · 19 λεπτά · 124K προβολές
Τι καλύπτει αυτό το βίντεο
Construction of an A-frame cabin on a sloped, clay-heavy site requires the installation of 18 isolated concrete footings to support the structure's footprint.▶ 16:03 The builder clears vegetation and removes tree stumps from the plot before digging individual holes for the footings.▶ 1:19 Because the site features a five-foot elevation drop across the corners, the builder opts to pour the footings level rather than attempting to establish a finished grade during the pour.▶ 14:54 This approach allows for later adjustment using concrete blocks and mortar to reach the required height for joists and beams.▶ 16:48 The builder uses a nine-foot span between footings to accommodate the A-frame design, which transfers the majority of the structural load to the outer edges.▶ 8:03 After the concrete cures for 24 hours, the builder plans to stack blocks to create pillars, filling them with concrete to ensure a solid foundation.▶ 18:03
Περισσότερα από το Sailing Good, Bad, and Ugly
Από Sailing Good, Bad, and Ugly — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.