TURNING A WILD CLIFFSIDE INTO MY DREAM A-FRAME CABIN (WITH NO EXPERIENCE)
29 June 2025 · 19 min · 124K views
What this video covers
Construction of an A-frame cabin on a sloped, clay-heavy site requires the installation of 18 isolated concrete footings to support the structure's footprint.▶ 16:03 The builder clears vegetation and removes tree stumps from the plot before digging individual holes for the footings.▶ 1:19 Because the site features a five-foot elevation drop across the corners, the builder opts to pour the footings level rather than attempting to establish a finished grade during the pour.▶ 14:54 This approach allows for later adjustment using concrete blocks and mortar to reach the required height for joists and beams.▶ 16:48 The builder uses a nine-foot span between footings to accommodate the A-frame design, which transfers the majority of the structural load to the outer edges.▶ 8:03 After the concrete cures for 24 hours, the builder plans to stack blocks to create pillars, filling them with concrete to ensure a solid foundation.▶ 18:03
More from Sailing Good, Bad, and Ugly
From Sailing Good, Bad, and Ugly — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



