Sailing Squibβίντεο

Squib's Refit - Grounding plate - Through-hull fitting - Galley - Railing stanchions - Odds and ends /106

13 Φεβρουαρίου 2025 · 17 λεπτά · 734 προβολές

Τι καλύπτει αυτό το βίντεο

Refitting the 38-ft sailboat *Squib* involves structural reinforcement, hardware installation, and plumbing maintenance. The crew installs a grounding plate for amateur radio by mounting it horizontally to the hull below the waterline, using gold-plated hardware and sealing the through-hull bolts with SikaFlex.8:03 To address loose railing stanchions, the team drills new mounting holes into previously installed internal reinforcement blocks, sealing the connections to prevent water ingress.3:29 The engine cooling through-hull fitting requires replacement after the original silicone sealant failed, causing the valve to loosen; the crew removes the old fitting and reseals the new one using marine-grade sealant.12:27 Additionally, the interior galley cabinetry is reinforced by laminating the base and rear panels to the bulkheads using thickened epoxy.16:38 The crew also routes the engine throttle cable and secures it with a clamp to ensure proper tension.12:17 These tasks are completed as part of a final push to finish two-person projects before the end of the refit period.3:12

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Squib

Sailing Squib - May 2026 /4Οκτ 2026Sailing Squib - May 2026/3Σεπ 2026Sailing Squib May 2026 /2Αυγ 2026Sailing Squib - Contemporary WitnessΙουλ 2026

Από Sailing Squib — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος