Sailing Squibvídeo

Squib's Refit - Grounding plate - Through-hull fitting - Galley - Railing stanchions - Odds and ends /106

13 de febrero de 2025 · 17 min · 734 visitas

Qué cubre este vídeo

Refitting the 38-ft sailboat *Squib* involves structural reinforcement, hardware installation, and plumbing maintenance. The crew installs a grounding plate for amateur radio by mounting it horizontally to the hull below the waterline, using gold-plated hardware and sealing the through-hull bolts with SikaFlex.8:03 To address loose railing stanchions, the team drills new mounting holes into previously installed internal reinforcement blocks, sealing the connections to prevent water ingress.3:29 The engine cooling through-hull fitting requires replacement after the original silicone sealant failed, causing the valve to loosen; the crew removes the old fitting and reseals the new one using marine-grade sealant.12:27 Additionally, the interior galley cabinetry is reinforced by laminating the base and rear panels to the bulkheads using thickened epoxy.16:38 The crew also routes the engine throttle cable and secures it with a clamp to ensure proper tension.12:17 These tasks are completed as part of a final push to finish two-person projects before the end of the refit period.3:12

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026 /4oct 2026Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema