Catamaran Mistertong βίντεο
#212 Our catamaran's crossbeam is back in place ...
25 Απριλίου 2026 · 51 λεπτά · 8K προβολές
Man oversees beam installation on catamaran hull
Τι καλύπτει αυτό το βίντεο
The owners of an Outremer catamaran are in the process of reinstalling the forward crossbeam after completing structural repairs.28:31 The project involves precise alignment, as the beam must be positioned against the hull’s forward bulkhead without the previous clearance gaps.5:05 To ensure structural integrity, the owner drills new holes and creates epoxy inserts in the fiberglass to provide a solid mounting surface, avoiding the structural weaknesses present under the previous owner's configuration.2:24
The installation process requires a dry-fit to mark hole locations, followed by a final bonding phase using structural adhesive.4:12 The team manages the weight of the approximately 80-kilogram beam by using a pulley system and manual positioning.23:05 Once the beam is aligned and bonded, the crew prepares for the final stage: laminating the joint with fiberglass to ensure a permanent, load-bearing connection.15:15 The project also includes installing a new bow roller assembly and preparing the forward deck area for trampoline attachments.3:50 The work is part of a larger refit project, with the team focusing on finishing structural tasks before moving to the bow sections.4:13
Περισσότερα από το Catamaran Mistertong
Από Catamaran Mistertong — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.
The Sailing Directory Newsletter
Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.



