#212 Our catamaran's crossbeam is back in place ...
25 de abril de 2026 · 51 min · 8K visitas
Man oversees beam installation on catamaran hull
Qué cubre este vídeo
The owners of an Outremer catamaran are in the process of reinstalling the forward crossbeam after completing structural repairs.28:31 The project involves precise alignment, as the beam must be positioned against the hull’s forward bulkhead without the previous clearance gaps.5:05 To ensure structural integrity, the owner drills new holes and creates epoxy inserts in the fiberglass to provide a solid mounting surface, avoiding the structural weaknesses present under the previous owner's configuration.2:24
The installation process requires a dry-fit to mark hole locations, followed by a final bonding phase using structural adhesive.4:12 The team manages the weight of the approximately 80-kilogram beam by using a pulley system and manual positioning.23:05 Once the beam is aligned and bonded, the crew prepares for the final stage: laminating the joint with fiberglass to ensure a permanent, load-bearing connection.15:15 The project also includes installing a new bow roller assembly and preparing the forward deck area for trampoline attachments.3:50 The work is part of a larger refit project, with the team focusing on finishing structural tasks before moving to the bow sections.4:13
Más de Catamaran Mistertong
De Catamaran Mistertong — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.