We did all this OURSELVES!! Radiant Flooring Installation (DIY Barn Build) Ep 335

18 Σεπτεμβρίου 2025 · 18 λεπτά · 120K προβολές · Montana

Crew lay radiant tubing across vast concrete foundation

Τι καλύπτει αυτό το βίντεο

The crew of Zatara is constructing a 100-by-120-foot barn-dominium in Montana, featuring an 80-by-80-foot living area and a 6,400-square-foot shop.0:22 To prepare for the concrete slab, the team installed PEX tubing for a radiant floor heating system.0:39 The installation required removing excess gravel to ensure six inches of clearance below the slab surface.4:03 Before pouring the concrete, the crew pressurized the PEX circuits to 100 pounds per square inch to verify the integrity of the lines and to identify potential damage caused by rebar installation.10:54 The project includes provisions for a car lift, floor drains, and future hot tub plumbing.0:42 The team also installed jackpole fencing around the property to exclude cattle from the building site.2:29 While the concrete work and plumbing were contracted out, the family performed the remaining construction tasks themselves.2:12

Παρακολουθήστε στο YouTube

Περισσότερα από το Sailing Zatara

FINALLY WEATHERPROOF! (Winter won't stop us now!)Σεπ 2026From One Extreme to the Other!Αυγ 2026Was that our Last Sail on Zatara? (+ big announcement! 📢)Αυγ 2026Why We AREN'T Afraid of Sharks!Ιουλ 2026

Από Sailing Zatara — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος