Sailing Zataravideo

We did all this OURSELVES!! Radiant Flooring Installation (DIY Barn Build) Ep 335

September 18, 2025 · 18 min · 120K views · Montana

Crew lay radiant tubing across vast concrete foundation

What this video covers

The crew of Zatara is constructing a 100-by-120-foot barn-dominium in Montana, featuring an 80-by-80-foot living area and a 6,400-square-foot shop.0:22 To prepare for the concrete slab, the team installed PEX tubing for a radiant floor heating system.0:39 The installation required removing excess gravel to ensure six inches of clearance below the slab surface.4:03 Before pouring the concrete, the crew pressurized the PEX circuits to 100 pounds per square inch to verify the integrity of the lines and to identify potential damage caused by rebar installation.10:54 The project includes provisions for a car lift, floor drains, and future hot tub plumbing.0:42 The team also installed jackpole fencing around the property to exclude cattle from the building site.2:29 While the concrete work and plumbing were contracted out, the family performed the remaining construction tasks themselves.2:12

Watch on YouTube

More from Sailing Zatara

FINALLY WEATHERPROOF! (Winter won't stop us now!)Sep 2026From One Extreme to the Other!Aug 2026Was that our Last Sail on Zatara? (+ big announcement! 📢)Aug 2026Why We AREN'T Afraid of Sharks!Jul 2026

From Sailing Zatara — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue