Entre Terras e Maresβίντεο

FINALLY THE AFT CABIN CEILING IS FINISHED!! S1.ep133

25 Αυγούστου 2024 · 34 λεπτά · 510 προβολές

Τι καλύπτει αυτό το βίντεο

The crew of a boat under refit completes the fiberglass ceiling panels for the aft cabin, a process involving fabrication, surface preparation, and painting. After molding the panels, the team sands them with 80-grit paper to remove mold release wax and correct surface imperfections.16:11 They apply polyester filler to fill voids, followed by additional sanding to achieve a smooth finish.17:52 To secure the panels while allowing for maintenance access to the engine room ventilation and wiring, the crew installs Fast Mount fasteners and uses velcro on the edges where vertical clearance is limited.13:45 The team applies a primer coat using a spray gun, followed by a final paint layer with PU (polyurethane) paint.22:36 They also treat and paint plastic portlight frames using an automotive-grade primer to prevent peeling.29:13 Despite achieving a high-quality finish, the crew performs final touch-ups with filler and paint to address minor surface defects revealed after the initial coat.30:52

Παρακολουθήστε στο YouTube

Περισσότερα από το Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Ιουλ 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Ιουν 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Ιουν 2026This week the focus was on something elseΙουν 2026

Από Entre Terras e Mares — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος