Entre Terras e Maresvideo

FINALLY THE AFT CABIN CEILING IS FINISHED!! S1.ep133

25 agosto 2024 · 34 min · 510 visualizzazioni

Cosa tratta questo video

The crew of a boat under refit completes the fiberglass ceiling panels for the aft cabin, a process involving fabrication, surface preparation, and painting. After molding the panels, the team sands them with 80-grit paper to remove mold release wax and correct surface imperfections.16:11 They apply polyester filler to fill voids, followed by additional sanding to achieve a smooth finish.17:52 To secure the panels while allowing for maintenance access to the engine room ventilation and wiring, the crew installs Fast Mount fasteners and uses velcro on the edges where vertical clearance is limited.13:45 The team applies a primer coat using a spray gun, followed by a final paint layer with PU (polyurethane) paint.22:36 They also treat and paint plastic portlight frames using an automotive-grade primer to prevent peeling.29:13 Despite achieving a high-quality finish, the crew performs final touch-ups with filler and paint to address minor surface defects revealed after the initial coat.30:52

Guarda su YouTube

Altro da Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183lug 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182giu 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181giu 2026This week the focus was on something elsegiu 2026

Da Entre Terras e Mares — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema