PAT | FRANKIEβίντεο

Mast off (a lot to go wrong) | BOAT DAMAGE DISASTER Part 3

10 Νοεμβρίου 2024 · 19 λεπτά · 16K προβολές

Τι καλύπτει αυτό το βίντεο

Following structural damage to their yacht, Pat and Frankie initiate a total interior and exterior teardown to facilitate repairs.1:54 After filing an insurance claim and hiring a surveyor, the couple spends four weeks removing the interior, sails, and boom.0:57 To access the hull structure, they hire a crane to unstep the 21-meter mast while the boat remains on the hard.1:26 Because the mast passes through the deck, the crew uses a main halyard and two safety lines attached to the spreaders to stabilize the rig during the lift.10:16 They loosen the rig and mast plate screws before the crane operator lifts the mast clear of the hull.11:14 With the mast removed, the couple prepares for a fiber specialist to inspect the structural damage.18:40 The process concludes with the boat on the hard and the mast successfully lowered.14:08

Παρακολουθήστε στο YouTube

Περισσότερα από το PAT | FRANKIE

12.5 days of REALITY crossing the Atlantic Ocean | Part 3 #sailingΙουν 2025Atlantic Crossing Part 2 | The Night from Hell + Discovering Cape VerdeΜαΐ 2025Leaving Everything Behind - The First 900 NM | Atlantic Crossing Part 1Απρ 2025The ULTIMATE Shakedown SailΦεβ 2025

Από PAT | FRANKIE — δείτε το σκάφος του καναλιού, το πλήρωμα και κάθε αναλυμένο βίντεο.

The Sailing Directory Newsletter

Ένα email με τις καλύτερες ανακαλύψεις του στόλου — τις στιγμές, τα σκάφη και τις ιστορίες που αξίζουν τον χρόνο παρακολούθησής σας. Εισάγετε τη διεύθυνσή σας για να λάβετε το δικό σας αντίγραφο.

Αναφορά προβλήματος